Process

We examine the site to discover its limitations and possibilities, and consider these features along-side the environmental,geographic and behavioral context.Our mission is to collaborate to create places, not just buildings and to transcend the standardized typologies and preset criteria of superficial, commercial architecture.
Warehouses have become the need in the recent times because of consolidation of commodities. With the advent of built to suit structures the design and layout of the warehouse has become even more challenging. The design has to be as per the BTS but the client has his own interest considering the finances involved and a perfect balance has to be achieved to suit both the interests.

PHASE1

SCHEMATIC DESIGN After receiving the signed Contract, the Architect shall proceed to design steps by taking all considerable factors of the requirement of each area.

1. Gathering all Site, Regulation, and Program information.
2. Preparing area estimate, cost plan, and updating work schedule.
3. Preparing Conceptual layout with Perspective or Model.
4. Developing the schematic up to the detail requirement of   Floor Plan and elevation in 1:100 scale

PHASE2

DESIGN DEVELOPMENT After receiving Final Schematic Design approval from the Owner. The Architect shall start preparing the Design Development. The Architect/Consultant shall develop the detail in accordance with the desire of the Project Owner, technical suitability, and standard of practice. In doing so, the Architect/Consultant shall take the following steps:

1. Developing the detail by means of studying architectural detail and proportion and also dimensioning to achieve our architectural quality.
2. Coordinating with all engineering systems.
3. Providing outline Specification for owner approval
4. Providing detailed development report [1 set of the report], in order to confirm all design approval that is led to construction drawing in the following step. Providing interior design details, including cabinets, cupboards, wardrobes, selected walls, etc. for the two houses.

PHASE3

WORKING DRAWING The Architect shall prepare the working drawings after the De-sign Development has been approved. The Architect shall provide all architectural and engineering drawings and documents required by the various Approving Authorities and assist the Owner with the necessary amendments as required by the Authorities.

PHASE4

CONSTRUCTION STAGE During construction the company shall:
1. Periodic supervision
2.  Provide supplementary details of the construction as required.
3. Review and approve drawings, materials for use in the construction, and results of the testing of
these materials.
4. Provide guidance to the contractor so that the work is carried out in an orderly manner.